We are planning the future: new production halls

The Dorstener Drahtwerke have given the go-ahead for the expansion of the production of wire meshes, welding grids and assembled parts at the location Dorsten. The production areas have been too narrow due to the expanded production possibilities and logistic bottlenecks have to be fixed. The almost 4000 sqm large new halls at Werrastr meet the latest requirements in terms of material flow, quality technology and occupational safety. The move is scheduled to take place in late summer 2021.